Buying guide

How to Build a Paver Patio

By Updated

As an Amazon Associate we earn from qualifying purchases. Our picks are researched from the manufacturers’ specifications and are our own editorial opinion.

How to build a paver patio: pavers being laid on a compacted gravel base
On this page
  1. Plan the Patio
  2. Materials and Tools
  3. How to Build a Paver Patio, Step by Step
  4. Pavers on Sand or on Concrete?
  5. Pavers vs a Deck
  6. Caring for a New Paver Patio
  7. Frequently Asked Questions

To build a paver patio, mark the area, call 811, dig out the soil, lay and compact a crushed stone base, screed a thin layer of bedding sand, lay the pavers in your pattern, cut the edge pieces, fix edge restraints, then sweep sand into the joints and compact the surface. The base is the part that decides whether the patio lasts, and most of this guide is about it. Below we cover the plan, the materials, each step in order, pavers on sand or on concrete, pavers against a deck and how to look after the finished patio.

Plan the Patio

Most failed patios fail on planning: the wrong size, no drainage thought or a line nobody marked. Spend an afternoon here.

Measure and Mark

Mark the shape with stakes and string or marking paint. Plan the size around what goes on the patio, a dining set, a grill or a fire pit. If a fire pit is part of the plan, read how big a patio should be for a fire pit, and for the pit itself see how to build a fire pit. Work out the paver count from the area, and add extra for cuts.

Plan the Slope and Drainage

Water has to leave the patio. ICPI says surface and subsurface drainage and pavement grades should follow those used for any other flexible pavement, so build in a fall away from your house and from anything that water could damage. We do not quote a slope figure here, because it depends on your site: ask your paver supplier or your local building office what they require.

Call 811 Before You Dig

The 811 service tells homeowners to contact 811 by phone or online a few days before breaking ground, with the exact wait set by your state, so utilities can send locators to mark buried lines. Keep the marks in place for the whole project and avoid digging on top of or near them, within 18 to 24 in on all sides.

Materials and Tools

Gather everything before you dig, because the base and the sand bed go in on the same day.

Materials

  • Pavers: ICPI recommends 2 3/8 in (60 mm) thick pavers for pedestrian areas such as patios.
  • Crushed stone base: compacted aggregate. Ask the supplier for a gradation made for paver bases.
  • Bedding sand: ICPI says it should meet ASTM C 33 grading, and not to use mason sand or stone dust, which it says can contain too much fine material.
  • Geotextile: used under the base over fine, moist soil, where the design calls for it.
  • Edge restraints: steel, aluminum, plastic edging made for pavers or troweled concrete.
  • Joint sand: regular fine sand or polymeric sand.

Tools

  • Shovel, wheelbarrow and a rake
  • Plate compactor (rent one)
  • Hand tamper for corners
  • Level, string line and two screed pipes with a straight board
  • Rubber mallet
  • Masonry saw or paver splitter, and a broom
  • Safety glasses, ear protection, gloves and a dust mask for cutting

Renting a Plate Compactor

ICPI gives the specs for the machine that sets pavers into the bedding sand: a minimum force of 5,000 lbs (22 kN) and a frequency of 75 to 100 Hz. Ask the rental counter for a plate compactor that meets that, and fit a rubber pad for the paver step so it does not scuff the surface. The base needs a plate compactor too, and the hand tamper is for edges only.

How to Build a Paver Patio, Step by Step

Numbers in this section come from ICPI Tech Spec 10, the Application Guide for Interlocking Concrete Pavements, and from the maker of the joint sand. Your soil, climate and local code can change them.

Step 1: Excavate

Dig down far enough for the base, the bedding sand and the thickness of the paver. Adding ICPI's figures, a 4 to 6 in base, 1 to 1 1/2 in of sand and a 2 3/8 in paver comes to roughly 7 1/2 to 10 in below the finished surface, which is our own sum, and not an ICPI figure. Dig a little past the patio edge so there is room for the edge restraints, and keep the sides square.

Step 2: Prepare the Soil and Add Geotextile if Needed

Compact the soil at the bottom of the hole. ICPI says geotextile is sometimes used under the base, over fine, moist subgrade soils, to extend the life of the base and reduce the likelihood of deformation. If your soil is wet clay, ask your supplier about it.

Step 3: Add the Stone Base

Spread the crushed stone in layers. ICPI says the base should be minimum aggregate bases for walks are 4 to 6 in, and that the compacted lift thickness depends on the force of the compactor, typically 4 to 6 in, so ask the rental counter what the machine can handle. Thickness depends on soil strength, drainage, climate and traffic loads. Make the surface of the base smooth: ICPI gives a tolerance of 3/8 in over a 10 ft straightedge.

Step 4: Compact in Layers

Run the plate compactor over each layer before adding the next. ICPI calls for compaction to at least 98% of standard Proctor density for pedestrian areas, a figure a contractor can test and that you will not meet by eye. Tamping well here is the difference between a flat patio and a wavy one.

Step 5: Screed the Bedding Sand

Lay two pipes on the base as guides, fill between them with sand and drag a straight board across to level it. ICPI says to screed the sand to an even 1 to 1 1/2 in thickness. Do not walk on the screeded sand, and do not use it to fill depressions in the base, because ICPI says they will be reflected in the surface of the finished pavement. Fix any dip with base stone and compact it again.

Step 6: Lay the Pavers

Start from a straight edge or a corner and work out, setting each paver down on the sand and not sliding it. Keep the joints even and check the line with a string every few rows. Stand on the laid pavers, not on the bed, as you work forward.

Step 7: Cut the Edge Pavers

ICPI says concrete pavers can be cut with a splitter or masonry saw to fit along the edge. Wear eye and ear protection, and cut outdoors to keep the dust off.

Step 8: Install the Edge Restraints

ICPI calls edge restraints essential to performance: the pavers and sand are held together by them, which lets the system remain interlocked. For patios it lists steel, aluminum, troweled concrete and submerged concrete curb, or plastic edging made for concrete pavers. Some types go in before the sand and some, such as plastic, steel and aluminum, can go in after the pavers are laid.

Step 9: Compact the Pavers and Fill the Joints

Run the plate compactor over the pavers to seat them into the sand. ICPI says the sand is then swept and vibrated into the joints until they are full. Our plan for the final fill is polymeric sand, covered next.

Step 10: Use Polymeric Sand

Alliance Gator's page for Gator Maxx G2 gives four steps: spread and sweep the sand, vibrate it in with a plate compactor and a rubber pad, sweep off the excess and leave the sand at least 1/8 in below the paver surface, then activate it with a watering gun on shower setting, starting at the low point and never letting the surface dry out while you do. The pavers must be completely dry and the joints must not be damp. The maker lists a minimum joint width of 1/8 in and a minimum joint depth of 1 1/2 in, and says the temperature must be above 32°F with dry conditions, with at least 15 minutes of dry weather after activation in a traditional application. Gator Maxx G2 is one polymeric sand; the DOMINATOR Polymeric Sand 40 lb bag is another, sold on Amazon by its maker, and its listing says it suits joints from 1/8 in to 4 in wide with a minimum depth of 1 in. Check which depth your pavers give before you pick, and read the label of the bag you buy.

Pavers on Sand or on Concrete?

For a typical patio, pavers on a compacted stone base and sand bed is the standard method, but there are cases where concrete comes into it.

The Standard Method

ICPI says interlocking concrete pavements are typically constructed as flexible pavements on a compacted soil subgrade and compacted aggregate base, with the pavers set on a thin layer of bedding sand. ICPI notes that the units do not rely on one continuous slab for their strength. It also says a repair can be done by lifting and reinstating the same pavers.

When a Concrete Base Is Used

ICPI mentions a concrete base around swimming pools, and says that when pavers go over a concrete base, drain holes are necessary at the lowest points to remove excess moisture in the bedding sand. If you want to lay pavers over an existing slab, check the slab for cracks and for a way for water to drain, and ask a local paver supplier or installer before you start.

Pavers vs a Deck

People ask which costs less. We will not quote prices, because they swing too much by region and material, and we have no source that holds across the country. Compare on the things you can check.

What to Compare

  • Time to use: ICPI says concrete pavers do not require time to cure and are ready for traffic immediately after paving.
  • Repairs: a damaged paver can be lifted and replaced, as ICPI notes. Ask a deck builder how they repair a board.
  • Ground level or raised: pavers sit on the ground, and a deck is a framed structure, so a sloped yard changes the work.
  • Upkeep: pavers need cleaning, and our guide on how to clean pavers covers it.

Get Real Quotes

Get two or three local quotes for both, in writing, and ask each contractor which base and which edge restraint they will use. That tells you more about the price than any national number.

Caring for a New Paver Patio

The care starts on day one. A new patio is not a finished patio until the joints have set and the edges are secure.

The First Days

Give the polymeric sand the dry weather its maker lists, and keep traffic off it. Alliance Gator says joints should never be in direct contact with foot traffic or tires while the sand sets. Top up any joints that settle with the same sand.

Ongoing Cleaning

Sweep the patio, rinse it and clean stains soon after they appear. Moss and algae are the usual problem in shady spots, and we cover them in how to clean pavers. Avoid blasting joint sand out with a pressure washer.

Furnish It

When the patio is ready, see our guides to the best patio tiles for a quick surface over an existing floor, and the best outdoor furniture to put on it.

❓ Frequently Asked Questions

For a typical patio, ICPI describes pavers on a compacted stone base with a 1 to 1 1/2 in bed of sand. A concrete base is used in some cases, such as around pools, and ICPI says it then needs drain holes at the lowest points to clear moisture from the sand.
We found no national figure we could trust, and costs vary by region and material. Compare local written quotes for both, and weigh the upkeep too. ICPI notes pavers need no cure time and can be repaired by lifting single units.
We found no maker data to answer on price. ICPI says factory pavers are made from zero slump concrete using machines that apply pressure and vibration, so a hand cast paver is a different product. ICPI adds that pavers from its members typically meet ASTM C 936.
ICPI says pavers need no cure time and are ready for traffic right after paving. Polymeric sand is the exception: Alliance Gator says joints should not take foot traffic while the sand sets, with at least 15 minutes of dry weather after activation. Follow the bag.